Cross-border procurement · Australia / China

Cross-border building materials, coordinated with the build.

Procurement works when specification, compliance, lead time, quality control, logistics and site interfaces are managed as one sequence.

Supplier partnerships · Business in planning

AUD Materials

Partner with AUD Materials to explore Australia’s residential materials market. Built on AUD Group’s local business foundation and AUD Build’s Sydney construction experience, the planned brand connects manufacturing strengths with the needs of Australian homes.

Discuss a supply partnership ↗

Source for the project, not in isolation.

AUD Group coordinates selected cross-border procurement where it supports project cost, programme or specification. A cheaper window that fails its wind rating, a stone batch that does not match the sample, or a joinery package that arrives after the plasterer has left will cost more than it saved. Every package is therefore reviewed against Australian requirements and the project's consultant documentation before anything is ordered.

Windows and façades

Specification, supplier coordination, samples, production timing and delivery interfaces.

  • AS 2047 ratings for the site's wind and water requirements
  • Glazing to AS 1288
  • Shop drawings coordinated with the frame and openings

Stone and finishes

Selection, samples, batch consistency, packing and site sequencing.

  • Natural stone, porcelain and tile packages
  • Approved control samples kept for comparison
  • No engineered stone, which is prohibited in Australia

Joinery

Shop-drawing coordination, finishes, hardware, quality review and installation interfaces.

  • Kitchens, vanities, wardrobes and feature joinery
  • Site measure before production
  • Hardware and spare parts planned for

Structural packages

Project-specific coordination with engineers, certifiers, builder and logistics providers.

  • Engineer review of product data
  • Certification documentation for the certifier
  • Delivery sequenced to the build programme

Compliance first

What every package must prove.

Price is the last thing to compare, not the first. Before production, each product needs evidence that it can be lawfully supplied and installed on the project.

Australian standards

Evidence of suitability under the National Construction Code, plus product standards such as AS 2047 for windows and AS 1288 for glass.

Certification marks

WaterMark for plumbing and drainage products and RCM for in-scope electrical equipment, where they apply.

Prohibited materials

No engineered stone, and asbestos-free documentation for products and components from higher-risk categories.

Biosecurity

Treated and marked timber packaging (ISPM 15) and clean shipments so goods clear the border without delay.

Read the full checklist: What cross-border sourcing must prove.

How a package runs

From specification to installation.

Each step has a sign-off, so problems are found at the factory rather than on site.

Specification and compliance review

Confirm the performance requirements with the architect, engineer and certifier, and the documents the certifier will need.

Supplier shortlist and samples

Compare suppliers on certification, capacity and track record. Approve physical samples and keep control samples.

Pre-production approval

Shop drawings, test reports and site measurements signed off before production starts.

Production and inspection

Quality checks during production and before packing, against the approved samples and drawings.

Shipping, clearance and delivery

Freight, insurance, customs and biosecurity clearance, then delivery sequenced to the build programme and site access.

Installation and handover

Installer interfaces, defects process, warranty documents and spare parts handed over with the project.

Cross-border sourcing usually works best for larger or repeated packages, custom windows, joinery and stone where specification control matters, and projects with enough programme lead time to plan production and freight properly.

Local supply is usually better for small or urgent items, products that cannot be certified for Australian use in time, and anything where after-sales service must be immediate.

The decision is made package by package, on landed and installed cost, programme risk and long-term support, as part of the wider development and construction plan.

Frequently asked

Procurement questions.

Availability, compliance, certification, warranty and suitability are assessed for each project and product package.

They must. Windows and external glazed doors need to be rated to AS 2047 for the project's wind and water requirements, and glazing selected under AS 1288. We ask for test reports and certification for the specific product before production, not after delivery.
No. Engineered stone benchtops, panels and slabs have been prohibited in Australia since 1 July 2024, and their import has been prohibited since 1 January 2025. Stone packages focus on natural stone, porcelain and other compliant alternatives.
It varies by product, but production, inspection, sea freight, customs clearance and delivery together often take several months. Packages are planned backwards from the installation date in the build programme, with a buffer.
Product responsibility, warranties and contracting arrangements are confirmed for each package before it is ordered, including who supports the product locally and how replacement parts are supplied.
No. Compare the landed and installed cost, not the factory price: freight, insurance, duty and GST, customs and biosecurity, local delivery, installation and a defects allowance. For small or urgent items, local supply is often the better choice.
Selected packages can be coordinated for other projects, subject to a review of the specification, the consultant documentation and the installing contractor's requirements.
Part of AUD Group's development platform. Cross-border procurement supports AUD Group's developments where it improves cost, programme or specification certainty. How AUD Group develops · Landowner partnerships

Bring us the package before the programme needs it.

Send the drawings or specification, quantities and the date the product is needed on site. We will tell you whether cross-border sourcing makes sense and what it must prove first.

Discuss a package